MIL-DTL-38195D
set. In addition, this failure shall be cause for refusal by the Government to continue acceptance of production sets
until evidence has been provided by the contractor that corrective action has been taken to eliminate the deficiencies.
Correction of such deficiencies shall he accomplished by the contractor at no cost to the Government on sets
previously accepted and produced under the contract. Any deficiencies found as a result of the inspection
comparison will be considered prima facie evidence that all sets accepted prior to the completion of the inspection
comparison are similarly deficient unless evidence to the contrary is furnished by the contractor and such evidence is
acceptable to the contracting officer.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract or
order (see 6.2). When actual packaging of materiel is to be performed by DOD personnel, these personnel need to
contact the responsible packaging activity to ascertain requisite packaging requirements. Packaging requirements
are maintained by the Inventory Control Point's packaging activity within the Military Department or Defense
Agency, or within the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department or Defense Agency's automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)
6.1 Intended use. The set is intended to supply pneumatic/electrical power for aircraft ground support and
general purpose military applications.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a.
Title, number, and date of the specification.
b.
Issue of DODISS to be cited in the solicitation, and if required, the specific issue of individual
documents referenced (see 2.2.1 and 2.3).
c.
Packaging requirements (see 5.1).
d. Time frame required for submission of First Article model (see 3.1).
e. When the government will conduct any or all of the first article examination and tests. When the
Government will conduct some but not all of the first article examination and tests, the contracting
officer should specify which examination and tests will be conducted by the Government and which
examination and test will be conducted by the contractor (see 3.1).
f.
When test schedule is other than as specified in Table V (see 4.5.1).
g.
Level of preservation and packaging and level of packing required (see 5.1).
h.
Conditions under which Government loaned property will be made available to the contractor.
i.
Disposition of Government loaned property at close of' contract.
6.3 Definitions.
6.3.1 Start. A set is considered to have started when it is operating at rated voltage and speed (see 3.4.1).
6.3.2 Stop. A set is considered to have stopped when it is at 0 rpm (see 3.4.2.3).