MIL-DTL-62186C
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed
by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point s packaging activity within the Military Department or Defense Agency, or within
the Military Department s System Command. Packaging data retrieval is available from the
managing Military Department s or Defense Agency s automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be
helpful, but is not mandatory.)
6.1 Intended use. The 28 V ac/dc, oil cooled alternator is intended for use in the
electrical generating systems of the M60 tanks, consisting of an alternator-rectifier and a
solid-state voltage regulator. The alternator provides regulated output at any engine load up to
500 A at any engine speed between 2000 and 2400 rpm, and at any load up to 650 A at any speed
between 2400 and 8000 rpm, when its field excitation is controlled by a solid-state regulator.
Given the extreme environmental conditions under which this item is designed to perform
(see 3.7), and the detail design requirements applicable only to the M60 Series Tanks (see 3.2),
this item is military unique.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a.
Title, number, and date of this specification.
b.
If required, the specific issue of individual documents referenced (see 2.2.1).
c.
If first article testing is required (see 3.1).
d.
If preproduction testing is required (see 4.1.1.1).
e.
If initial production testing is other than as specified (see 4.1.1.2).
f.
Specification of conformance testing (see 4.1.2).
g.
Specification of sampling plan (see 4.1.2.1).
h.
If inspection conditions should be other than as specified (see 4.2).
i.
If trial installation on an engine conforming to Drawing 11682700 is required
(see 4.3.6.1).
j. If trial operation with a regulator conforming to MIL-DTL-62187 is required
(see 4.3.6.2).
19
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business