MIL-P-53132(ME)
TABLE I. Examination schedule.
Number |
Characteristic |
Requirement Paragraph |
101. 102. 103. 104. 105. 106. 107. 108. 109. 110. 111. |
Materials not as specified. Materials not resistant to corrosion or deterioration or treated to be made resistant to corrosion or deterioration for the applicable storage and operating environment. Dissimilar metals, as defined in MIL-STD-889, not effectively insulated from each other. Used, rebuilt, or remanufactured components, pieces or parts incorporated in the power plants/power units. Safety not as specified. Vehicle registration marking and identification plate missing, incomplete, improper location or size. Treatment, painting, and camouflage pattern not as specified. Dimensions not as shown on drawings. Components missing or not as specified. Assembly not as shown on the drawings. Workmanship not as specified. |
3.3, drawings 3.3.1, drawings 3.3.2 3.3.3 3.1.2.1 3.5 3.8, drawings 3.1.2 3.1.2 3.1.2 3.10 |
4.6 Tests.
4.6.1 Load transfer for power plants. The following procedures shall be followed for testing load transfer of the 3kW power plants, 5kW & 10kW power plants, and 15kW - 60kW power plants, respectively.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.